1990 → 2026

From a notebook page to PRISMA.

In 1990, three engineers were asking themselves how to pay the rent and the electricity bill, and how to win more clients. This is the answer, year by year.

Our history, year by year

1990

A notebook page

Alejandro Muñoz, Daniel Quiun, and Marcos Tinman begin working together. On May 18, in the midst of hyperinflation, they bill their first recorded project: P.900. Their to-do list includes selling software and computers, and one question: how do we secure a minimum monthly income to cover rent and electricity?

To-do list and income ledger from 1990, with the initials of the three partners.
To-do list and income ledger from 1990, with the initials of the three partners.
To-do list and income ledger from 1990, with the initials of the three partners.
1991

The company is founded

On January 1, 1991, Prisma Ingenieros Asesores Consultores begins operations. The second question on that page, “we need other clients—how?”, begins to be answered one project at a time.

1995

The first large hotels

Working with Gremco brings the first large-scale hotels, such as the Hotel Suites Plaza Las Flores. The construction sign already shows PRISMA in charge of the structures.

Golf 5 Estrellas project sign: structures by Tinman, Quiun, and Muñoz.
Golf 5 Estrellas project sign: structures by Tinman, Quiun, and Muñoz.
1998

A team of twenty

The year-end outing brings together about twenty people. That same year, PRISMA visits the Estadio Monumental construction site, its largest project to date.

The 1998 outing and a visit to the Estadio Monumental construction site.
The 1998 outing and a visit to the Estadio Monumental construction site.
The 1998 outing and a visit to the Estadio Monumental construction site.
2000

Estadio Monumental

The Club Universitario de Deportes stadium opens: stands for 60,000 spectators, private boxes, a museum, a tunnel, and bridges, with 60,000 m² of built area.

Estadio Monumental
2001

The technical voice after the earthquake

After the southern Peru earthquake, El Comercio publishes “Diseños antisísmicos” (Seismic-resistant designs), in which Muñoz, Quiun, and Tinman propose seismic protection systems for the country.

El Comercio, Construir supplement, July 2001.
El Comercio, Construir supplement, July 2001.
2013

Buildings that move without damage

The first buildings with seismic isolation and energy dissipation arrive: PUCP, Atlantik Ocean Tower, Torre Barlovento, and Torre Orquídeas. By 2019, more than 80% of Peru's buildings with modern seismic protection had been designed by PRISMA.

Buildings that move without damage
2019

Pan American Games

The Velodrome, Athletics Stadium, and Bowling Center at VIDENA, and the Polideportivo Miguel Grau: fast-track design in collaborative BIM, with 130 m space trusses.

Pan American Games
2024

Hospitals that keep running

Hospital de Llata opens, and the new Clínica Internacional tower is designed with 103 isolation devices.

2025

PRISMA 360

An in-house platform brings together engineering, quotes, people, and e-signatures, and a server runs automated routines on ETABS, SAP2000, and OpenSees.

PRISMA 360
2026

And we keep going

35 years, more than 35 million m² designed, and more than 60 people. The 1990 page is still kept; the questions have changed.

And we keep going

Let’s talk

Have a project in mind? Let’s review it together from the start.

The earlier we get involved, the more alternatives we can evaluate to reduce costs and schedules.

Chat with us on WhatsApp?